|
|
Hazardous Waste Landfill Construction & Operation |
|
EARTHCLEAN
is specialized in the construction of hazardous waste landfills. the
landfills in Kuwait is insulated with 2.5mm thick HDPE & provided with a
complete leachate collection& pumping system .it has 4 ground water
monitoring wells for early leak detection . |

During
the construction of SWRTS |
|
The leachate
waste water is pumped up to the surface evaporation pond for further
treatment .The leachate network is provided with seven long /perforated
pipes for the collection of leachate and its sloped by gravity to a
collection septic tank. The capacity of landfill is 125.000cubic meters
.only solid hazardous waste is disposed in the landfill .Ground water is
monitored for early leak detection .all the disposed waste is tracked by
an XYZ location for company /waste owner.
|

|