Hazardous Waste Landfill Construction & Operation

EARTHCLEAN is specialized in the construction of hazardous waste landfills. the landfills in Kuwait is insulated with 2.5mm thick HDPE & provided with a complete leachate collection& pumping system .it has 4 ground water monitoring wells for early leak detection .

 

During the construction of SWRTS

The leachate waste water is pumped up to the surface evaporation pond for further treatment .The leachate network is provided with seven long /perforated pipes for the collection of leachate and its sloped by gravity to a collection septic tank. The capacity of landfill is 125.000cubic meters .only solid hazardous waste is disposed in the landfill .Ground water is monitored for early leak detection .all the disposed waste is tracked by an XYZ location for company /waste owner.