Installation of New 20” Gas Oil Pipeline from Mina Al Ahmadi (MAA) to New Gas Turbine Station at Subiyah Power Station. 2006)
Client: Worley Parsons
The aim of this study was to carry out an Environmental Impact
Assessment (EIA) and Analysis based on the Environmental Baseline
Studies, for the Installation of New 20” Gas Oil Pipeline from Mina Al
Ahmadi (MAA) to New Gas Turbine Station at Subiyah Power Station.
Experts from all the relevant discipline were involved in the study to
assess the possible and potential impact due to the project. The
approach adopted was based on national and international studies done
for such type of projects and steps of the EIA was followed in
particular